Skip to main content

District 40

Mathieu Eugene

Crown Heights, East Flatbush, Flatbush, Kensington, Midwood, Prospect Park, and Prospect Lefferts Gardens

Winning Projects:

EducationFunded
Computer Lab Updates for Local Schools

Votes: 803 | Cost: $140,000

PS 249, PS 245, PS 139, PS 6
General technology updates at P.S. 249, P.S. 245, P.S. 139, and P.S. 6

EducationFunded
Gymnasium Upgrades at Erasmus High School

Votes: 514 | Cost: $150,000

911 Flatbush Avenue
Physical upgrades to the gymnasium

EducationFunded
Smartboards for P.S. 92

Votes: 396 | Cost: $175,000

601 Parkside Avenue
Twenty-nine smartboards are needed for PS 92.

EducationFunded
Technology Updates for M.S. 2 Parkside Academy

Votes: 489 | Cost: $35,000

655 Parkside Avenue
Various technological updates at M.S. 2 Parkside Academy

Parks & RecreationFunded
Community Barbecue Sites in Prospect Park

Votes: 522 | Cost: $80,000

Lincoln Rd & E Drive; Parkside Ave & E Drive
New-style municipal grills, which are similar to those at Brooklyn Bridge Park Picnic Peninsula.

Parks & RecreationFunded
Kensington Dog Run

Votes: 309 | Cost: $135,000

Parade Grounds
An enclosed Dog Run at the Parade Grounds

Parks & RecreationFunded
Replacement of “Lake Mess Monster”

Votes: 440 | Cost: $140,000

Prospect Park Lake
A vessel that would grind up duck weed and other contaminants that cause visible pollution in the Prospect Park Lake.

TransitFunded
Little Red Riding Hood Pre-K Sidewalk Extension

Votes: 199 | Cost: $300,000 (Brooklyn Borough President Eric Adams is allocating $100,000)

NE corner of Rogers Ave. and Lefferts Ave.
Sidewalk extensions at this corner paired with heavy-duty bollards

TransitFunded
Real-Time Passenger Information

Votes: 385 | Cost: $40,000

Lincoln Rd Entrance; Church Ave. B35 Stop
Bus display signs that are visible from a distance and inform riders when their bus will arrive


The following projects were not funded:

Transit
Montessori School Sidewalk Extension

Votes: 187 | Cost: $300,000

SE corner of Rogers Ave. and Rutland Rd.
Sidewalk extension on the South East corner matched by a painted curb extension with flexible post barriers

Transit
P.S. 92 Sidewalk Extension

Votes: 232 | Cost: $300,000

SW corner of Rogers Ave. and Winthrop St.
A concrete sidewalk extension, which could be matched by a painted curb extension with flexible post barriers on the North West corner.