District 34

Antonio Reynoso

Williamsburg, Bushwick, Ridgewood

Winning Projects:

EducationFunded
21st Century Technology at P.S. 120 and P.S. 132

Votes: 1869 | Cost: $285,000

18 Beaver Street /320 Manhattan Avenue
Includes smart boards, laptops, smart tables, a 3-D Printer, a green wall, and solar & weather panels.

EducationFunded
A Cool Gym at P.S. 257

Votes: 1467 | Cost: $250,000 (Brooklyn Borough President Eric Adams is allocating $100,000)

60 Cook Street
An air conditioner in the school gym, which is used throughout the school year and summer programming.

EducationFunded
Technology Upgrades at P.S. 239 and P.S. 18

Votes: 1970 | Cost: $400,000

15-17 Weirfield Street /101 Maujer Street
Includes two new laptop carts, two smart tables, a 3-D printers, six smart boards, and forty-two desktops.

HousingFunded
Playground Upgrade at Williamsburg Houses

Votes: 1847 | Cost: $350,000

176 Maujer Street – Block 1
This playground will get new benches, play equipment, and a sprinkler system.

TransitFunded
Real Time Passenger Boards

Votes: 853 | Cost: $60,000

Ridgewood, Bushwick, and Williamsburg
Real Time Passenger Information in Council District 34. DOT will choose site locations with the City Council office post budget adoption.


The following projects were not funded:

Arts, Culture & Community
Electrify our Libraries in District 34

Votes: 1281 | Cost: $360,000

Bushwick, Leonard, and Dekalb Libraries
This proposal will provide four electric charging tables at each one of our libraries: Leonard Street, Bushwick Avenue and Dekalb Avenue. Residents will be able to work and re-charge from the same place.

Arts, Culture & Community
Upgrade to Activity Rooms

Votes: 655 | Cost: $200,000

81 Devoe Street
This proposal will upgrade the activity room in the Leonard Street Library and will include collapsible tables, folding chairs, rugs, freshly painted walls and new book bins.

Arts, Culture & Community
Upgrade to Activity Rooms in District 34

Votes: 742 | Cost: $600,000

Bushwick and Dekalb Libraries
This proposal will include collapsible tables, folding chairs, rugs, freshly painted walls and new book bins for all three district libraries: Leonard Street, Bushwick Avenue and DeKalb Avenue.

Education
Auditorium Facelift at P.S. 147

Votes: 1228 | Cost: $400,000

325 Bushwick Avenue
Includes 300 new chairs, a new stage, and re-wiring for better sound equipment.

Education
Visual Arts Classroom Upgrade

Votes: 1148 | Cost: $200,000

183 S. 3rd Street
This upgrade at MS 50/El Puente Community School calls for upgrades to lighting for accurate color work, ceiling tracks to hang 3-D art work, and new floors for an all around visual arts experience.

Housing
Grounds Renovation at Bushwick Houses

Votes: 1047 | Cost: $200,000

50 Humboldt Street, Bushwick Houses
This grounds renovation will focus on installing fence around an existing garden located behind the community center. It will be designed to budget and may include installing walkways and seating.

Parks & Recreation
Repaving our Bushwick Parks

Votes: 1273 | Cost: $500,000

50 Humboldt Street, Bushwick Houses
Maria Hernandez Park and Fermi Playground can expect ground pavement, landscaping, and modern benches.